Main stages of repair works in the apartment or condo

Main stages of repair in the apartment.

How to begin repair works of the apartment?

The very first phase of the repair work of old apartment or condos is the damage and dismantling first of all of the worn out walls and partition walls, eliminating the wall and ceiling coating. This phase is among the most "unclean" stages of the repair.

One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this firstly since dirt and dust will be unallowable throughout following phases and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature and moisture are unallowable). After installing windows and windowsills it is needed to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is circuitry. Electrical wiring can be set up in walls or along the floor. Wiring is made inside the pipelines to ensure electrical safety and increase reliability. The pipeline protects wiring from external damages and enables to change the wire entirely without breaking walls and floor merely by placing the new wire rather of the old one.

House Painting follows the electrical wiring. The frequent error during the synchronised conducting of such works occurs when employees forget to set out among the cables and house painters have already plastered and smoothed out the wall. As a result, additional works are needed to seal chases on the finished wall. The places of the feed switch and wall outlet area and their number should be thought-out beforehand. The scheme of power wiring is usually consisted of into the design project.

Later on the system must be all set to service in case of failures. In addition to the wirings, the telephone cable and the TV cable are laid out. The power cable television need to not be laid out near the telephone and antenna cables to prevent noise plumber frankston article pickup and interference. The most strange moment is setting out the television cable. In order to make 2 (or three) TV sets in the house the 2nd cable is frequently merely "firmly soldered" in parallel, so the cable television resistance is lowered. As a result, the screen quality is weakened, numerous programs can't be received and etc. In order to avoid such situation it is essential to invite an expert with unique equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted concurrently in all properties, if it is possible. Delays are related to the innovation. Each used layer of the plaster (or completing finishing) should dry entirely before the work will continue.

Works in hygienic arrangements and the kitchen area start all at once with house painting. It is much better to fulfill so-called "unclean" operate in the first place and concurrently. In accordance with the plan of the hygienic professional location welding, wall chasing and pipeline run are carried out. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then operates in hygienic arrangements are conducted according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface area appearance. The finish puttying of walls is performed concurrently. The highly exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines moisture of the material.

The following stage is the process of fill. Fill can be made with different products-- from normal masonry cement-sand mixture to self-aligning floors. The advantage of the simple mix is its cheapness, the downside is that such mix is much more difficult lined up at the level and the final dry time of such fill is 40 days, just then the next phase of the work with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floorings are a lot more costly, however more technological. Aligning takes place almost "automatically" i.e. fluid option of mixture is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry aligning (the fill technology) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Installation of doors need to take into the account thickness of future flooring covering. After installation the door can be taken off its hinges and got rid of up until the end of repair or loaded into polyethylene movie to protect from damages. At the same time ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile needs to be laid on the definitely dry overlay.

Finishing of the flooring installing depends upon the prepared covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

image

In premises where finish covering of the floor is laminated floor covering or parquet stockpile, the common wallpapers are pasted (not for painting) in the first location. Then the flooring covering is mounted.

If surface covering of the floor is the block parquet, the parquet plumbing tips is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out consequence is connected just with such scrambling process when the excellent amount of dust is created. In spite of the fact that good flooring mills are geared up with the vacuum cleaner, the adequate quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is very acerbic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be completed. It is left only to install the plinths, ornamental elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is required to note that the series of works was listed in general and can alter depending upon the definite situation-- the number of rooms in facility, your resources, peculiarities of the building of the multilevel facilities. It is based on common sense and everyone capable of analysis can individually develop such a series.